Additional
structural steel columns will need to be
installed in the building to support the
400-ton weight of the new unit. To avoid
disruption to the occupied spaces, work
schedules will be coordinated with
occupants.
A newly constructed structural steel
platform on the roof will receive the
Mega-Unit which will be hoisted in thirty
three sections and assembled. The existing
building’s MEP / FP systems will then be
connected to the new unit.